2133 Just completed lay-off checks for nearly 200 well paid union tradesmen because slow joe pulled the KXL permits. (twitter.com) posted 85 days ago by John_Miller__ 85 days ago by John_Miller__ +2133 / -0 100 comments share 100 comments share save hide report block hide child comments Comments (100) sorted by: top new old worst You're viewing a single comment thread. View all comments, or full comment thread. ▲ 92 ▼ – grndmrshlgando 92 points 85 days ago +92 / -0 Holy shit less than 24 hours already decimating the economy. permalink save report block reply ▲ 27 ▼ – Kraznaya 27 points 85 days ago +27 / -0 How much of the pipeline got built? I heard they were only able to pull the permit for the last section. I wonder if there's a way around that. permalink parent save report block reply ▲ 25 ▼ – veritasvincit 25 points 85 days ago +25 / -0 PVC pipe and duct tape? permalink parent save report block reply ▲ 12 ▼ – ScuffAndy 12 points 85 days ago +12 / -0 bluetooth 🤣 permalink parent save report block reply ▲ 10 ▼ – SuddenlyClintoned 10 points 85 days ago +10 / -0 It was literally mostly in the ground. They got to the Canadian border last week. permalink parent save report block reply ▲ 17 ▼ – Kraznaya 17 points 85 days ago +17 / -0 From what I can tell, the part of the project that crosses the border is actually finished. https://abcnews.go.com/Health/wireStory/piece-disputed-keystone-xl-pipeline-finished-70814560 The only reason the pipeline needed Federal approval in the first place was because it crossed the border. Since that part is done, they might be able to get the individual states to approve the rest. permalink parent save report block reply ▲ 10 ▼ – PraiseBeToScience 10 points 84 days ago +10 / -0 Just build it anyway lol permalink parent save report block reply ▲ 6 ▼ – Ato3K 6 points 84 days ago +6 / -0 Secession. permalink parent save report block reply ▲ 9 ▼ – JamesBond007 9 points 84 days ago +9 / -0 Democrats ruin everything they ever touch. Totally incompetent permalink parent save report block reply ▲ 2 ▼ – MadisonCandle 2 points 84 days ago +2 / -0 they touch themselves a lot. permalink parent save report block reply
Holy shit less than 24 hours already decimating the economy.
How much of the pipeline got built? I heard they were only able to pull the permit for the last section. I wonder if there's a way around that.
PVC pipe and duct tape?
bluetooth 🤣
It was literally mostly in the ground. They got to the Canadian border last week.
From what I can tell, the part of the project that crosses the border is actually finished.
https://abcnews.go.com/Health/wireStory/piece-disputed-keystone-xl-pipeline-finished-70814560
The only reason the pipeline needed Federal approval in the first place was because it crossed the border. Since that part is done, they might be able to get the individual states to approve the rest.
Just build it anyway lol
Secession.
Democrats ruin everything they ever touch. Totally incompetent
they touch themselves a lot.