39
Comments (3)
sorted by:
1
NickAtNight 1 point ago +1 / -0

Perhaps they should have followed the same route as the existing line ?!?

1
Gulleyfoyleismyname [S] 1 point ago +1 / -0

The shortest distance between two points is a straight line.

Longer line means more pipe money and more pump money equals higher cost at the end of the line.

1
PB_Mack 1 point ago +1 / -0

They just build a second pipe next to existing lines now.