12
Comments (8)
sorted by:
You're viewing a single comment thread. View all comments, or full comment thread.
1
Lurking_Waiting 1 point ago +1 / -0

Fore and aft of the vessel made contact with the canal. Machinery inspection is required. The hull of the vessel needs to be checked. Power trials. Then it should be ready. Big ship. May take a month or more.