If you take the currently accepted timeline for The Great Pyramid
It consists of 2.3 million blocks of limestone and granite, some weighing as much as 80 tonnes but most between 2 tons and 30 tons and was constructed over a 20-year period.
2,300,000 / (365.25 x 20 x 24) = 13 blocks per hour
So one at least 2 ton block was put into place every 5 minutes
Which also means one 2 ton block was quarried and shaped every 5 minutes
Which includes 144,000 casing stones, all highly polished and flat to an accuracy of 1/100th of an inch and weighing 15 tons.
The casing stones weighing as much as 20 tons were placed with an accuracy of 5/1000ths of an inch, and an intentional gap of about 2/100ths of an inch for mortar.
And I'm expected to believe they did this with wet wood and bronze chisels.
I just don't buy it.
If you take the currently accepted timeline for The Great Pyramid
It consists of 2.3 million blocks of limestone and granite, some weighing as much as 80 tonnes but most between 2 tons and 30 tons and was constructed over a 20-year period.
2,300,000 / (365.25 x 20 x 24) = 13 blocks per hour
So one 2 ton block was put into place every 5 minutes
Which also means one 2 ton block was quarried and shaped every 5 minutes
Which includes 144,000 casing stones, all highly polished and flat to an accuracy of 1/100th of an inch and weighing 15 tons.
The casing stones weighing as much as 20 tons were placed with an accuracy of 5/1000ths of an inch, and an intentional gap of about 2/100ths of an inch for mortar.
And I'm expected to believe they did this with wet wood and bronze chisels.
I just don't buy it.